• Online Edition
  • About
  • Support The Sheet
  • Contact

The Sheet

  • News
    • Mountain Town News
    • Sports and Outdoors
  • Arts and Life
  • Opinion/Editorial
  • Letters to the Editor
  • Dining

Scenic Loop construction

  • by Sheet Staff
  • in News
  • — 28 Jun, 2010

As of June 23, sections of the Mammoth Scenic Loop Road have been closed to through traffic for reconstruction.

According to U.S. Forest Service/Inyo National Forest management, the reconstruction project will take place in two phases with the road not fully open from U.S. 395 to Hwy 203 until November of this year.

During the first phase, which began earlier this week, the Scenic Loop Road will be closed from its intersection with Hwy 203 to the Inyo Craters Road.  This phase will last sometime into August.

During this phase, motorists wishing to visit the Inyo Craters will have to access the Inyo Craters Road from U.S. 395. During the second phase, starting around the end of August, the Scenic Loop Road will be closed from the Inyo Craters Road to US 395, with access to the Inyo Craters being from Highway 203.

Recreation-seekers on trails or roads that intersect the closed part of the Scenic Loop Road will not be able to go onto or cross the Scenic Loop Road. Likewise, the Forest Service said there will be no access to that general part of the forest that is accessed by the Scenic Loop Road while it is closed for the reconstruction.

During the reconstruction project, plans call for the Scenic Loop Road to be widened and slightly realigned, and 5-foot wide bike lanes will be added to each side of the road. The road will also be widened near the snow play area, which the Forest Service says will “enhance the safety and recreation experience for both residents and visitors.”

The approximately $5 million project is being funded by the Federal Highway Administration, with some funding also coming from the American Recovery and Reinvestment Act (ARRA). The project was recently awarded to Qualcon Construction of Minden, Nev., which has already begun survey work.

Share

Topics: mammothsheet

— Sheet Staff

This story was written by multiple authors whose names are below the header at the top of the page, or by The Sheet staff.

You may also like...

  • Arbitrator reinstates Madrid 23 Feb, 2013
  • Bishop High School skiers sparkle in state Alpine championships 19 Mar, 2013
  • Blue Sky changes it up 17 Jun, 2011
  • Long Beach singers to tear it up in Mammoth 29 Mar, 2012
  • Previous story Cart before the horse
  • Next story Reds Meadow Road now open
  • Special Publications

  • Recent Posts

    • GET A PIECE OF THE ROCK
    • OBITUARY: BRIAN SIEBERT 1973-2026
    • SEAL OF APPROVAL
    • GIVE ME LIBERTY OR GIVE ME … $1.1M
    • IT’S A HARD KNOCK LIFE FOR BEARS
  • Special Publications

  • News
    • Mountain Town News
    • Sports and Outdoors
  • Arts and Life
  • Opinion/Editorial
  • Letters to the Editor
  • Dining

© 2026 THE SHEET. DEVELOPED BY PENDERWORTH.